WASTE MANAGMENT PROJECTS

Regional Center for Waste Management Kalenić

(Kolubara Region, Serbia)

Phase I: Design and Construction Permit (2019–2020)

Phase II: Consultancy and Tender Documentation (2023–ongoing)

Period: Phase I:

February 2019 – February 2020


Area: ~40 ha

Capacity: ~120,000 t/year of non-hazardous municipal waste

The project involved the preparation of preliminary and main design documentation required for obtaining a construction permit for the Regional Center for Waste Management “Kalenić,” serving 11 municipalities across the Kolubara region.

Located near the town of Ub, the facility is designed to provide sustainable regional waste management through the construction of a new sanitary landfill, supporting infrastructure, and the remediation of the existing landfill site.

Period: Phase II: 2023 – Ongoing

Enviro System was engaged to provide consultancy services for the preparation of studies, conceptual designs, and tender documentation for the continued development of the Regional Waste Management Centre “Kalenić.” The assignment includes technical assessment, preparation of design concepts, and integration of environmental and social requirements in accordance with EBRD standards and national regulations.

OUR SOLUTION

Enviro System – Scope of Services

  • Preparation of preliminary, main, and tender design documentation for the Regional Waste Management Centre “Kalenić”

  • Technical assessment and conceptual design for regional waste management infrastructure

  • Design and tender preparation for recycling yards, transfer stations, and landfill facilities

  • Environmental and social compliance, including integration of ESAP measures and adherence to EBRD Performance Requirements (PR1–PR10)

  • Coordination of multidisciplinary design teams and verification of compliance with national and EU standards